THE HOME OFFICE, UK Border Agency
Requirements
Lakeside Demountable Aluminium Flood Barriers;
Lakeside Slimline Demountable Aluminium Flood Barriers
Flood Barrier Accessories
Overview
The barriers have been utilised in the last flood.
On the 20th February 2022 the water reached 450mm above finished floor level and the building remained dry and operational
Installation date
February 2022.